STEM and Slam Dunks

Apr 7, 2023
1 min read
Construction at the new Grandville 7/8 middle school building is well underway! One of the features of the new space is the combined basketball court/robotics arena. The gym is starting to receive its hardwood flooring, as seen in the photo below. The first two layers are placed at different angles to provide stability and support before the final 1-inch thick boards are placed and lines painted. The space is able to be divided by a partition curtain so the robots are not at risk from any stray basketballs. Check out more photos of the site below!
Flooring being assembled Gym view from above Outdoor court/field space Robotics portion of the gym Orchestra room Robotics work spaces Auxiliary gym and PE classroom Locker room Pump truck pouring concrete Staircase/student lunch area Lights above stairway Hallway with classrooms Tilework for drinking fountain STEM Classroom Science patio Breakout space with a view! View from a breakout room Serving area for cafeteria Bathroom entry/sink area Classroom space



Comments